Red Thunder - Scenario "2A Feuer und Bewegung"
Author: George MCCreated with versionCMRT v1.00 to v1.03Requires module(s): Uses mod tags:

No picture provided!11/8/44 0800Hrs KG "von Schroif" is tasked to secure the Line of Departure for a planned assault to secure a bridgehead over the CZARNA River.

Battle Type: Axis Probe Date: 1944/08/11
Time: Dawn 08:00 Length: 01:30
Size: Medium
Map Size: w: 1184 m d: 1024 m Area: 1.212 Sq. km
Region: Eastern Europe Terrain: Open
Weather: Mist and Cool Ground Conditions: Damp
Early Intel: Neither theBlitz Size Modifier: 7