The Lost Company must cross and obstacle belt under construction, engage and disrupt
UK Engineers and exit safely.
Included with the campaign
| Battle Type: | Meeting Engagement | Date: | 1979/05/25 |
| Time: | Day 07:00 | Length: | 00:45 |
| Size: | Small | Terrain: | Open |
| Map Size: | w: 1568 m d: 1248 m | Area: | 1.957 Sq. km |
| Region: | Germany | Early Intel: | Neither |
| Weather: | Clear and Cool | Ground Conditions: | Damp |
| theBlitz Size Modifier: | 3 |