Scottish Corridor campaign mission 9 - Germans assault the 2nd ASH defensive positions
at Gavrus - ASH finale
Included with the campaign
| Battle Type: | Allied Attack | Date: | 1944/06/29 |
| Time: | Day 19:10 | Length: | 01:00 |
| Size: | Medium | ||
| Map Size: | w: 560 m d: 960 m | Area: | 0.538 Sq. km |
| Region: | France | Terrain: | Open |
| Weather: | Thick Haze and Warm | Ground Conditions: | Dry |
| Early Intel: | Neither | theBlitz Size Modifier: | 6 |