C Company, 1/508 PIR links up with 2/505 PIR.
Included with the campaign
| Battle Type: | Allied Attack | Date: | 1944/06/06 |
| Time: | Day 08:30 | Length: | 00:30 |
| Size: | Medium | ||
| Map Size: | w: 608 m d: 560 m | Area: | 0.34 Sq. km |
| Region: | France | Terrain: | Open |
| Weather: | Overcast and Cool | Ground Conditions: | Damp |
| Early Intel: | Neither | theBlitz Size Modifier: | 5 |